Feedback

Construction of the NC KazMunayGas JSC dispatch and analysis centre completed

The project includes: reconstruction of the existing premises; installation and connection of engineering networks; installation and commissioning of high-tech equipment, including a seamless LED video wall with 1.2mm pitch; installation of server and computer equipment; creation of an automated control system for the control and analysis centre.